County Road Conditions

CURRENT ROAD CONDITIONS AS OF 02/21 02:00 pm

  • Lake McClure Road Detour near the Exchequer Hydro Dam (mud and rock debris still present, drive with caution)

Closed Creek Crossings

  • Silva Road Crossing (This is located on the dirt portion of Silva Rd)
  • Leonard Road @ the Middle Fork of the Chowchilla River Crossing

County Roads Currently Under Chain Control 

Scott Road into Mariposa Pines is R1

Chain Control Definitions:

R1: Chains are required - snow tread tires allowed. 

R2: Chains are required on all vehicles except four wheel drive vehicles with snow tires on all four wheels. 

R3: Chains are required - all vehicles - no exceptions.

General County Road Information

The following sections of roadway will receive Final and Permanent Repairs resulting from damaging flood events the county suffered in the last few years.  The County recently received funding to accomplish permanent repairs to the roads listed below and as such please expect to see repairs accomplished on these sections of roadway as weather permits.

Given the time of year and the potential for adverse weather conditions we recommend that you check this website often in order to get the most up to date road construction schedules.

Thank you for your kind understanding of what we are trying to accomplish on your behalf.  

Roads Affected by Floods of 2018

  • Ahwahnee Road – Closed
    • Repairs to begin after the 1st of the year with Road closure with Detours
  • Hornitos Road/Corbet Creek (just west of Old Toll) – Open – Loose Gravel
  • Hornitos Road/Bear Creek (near Whispering Oaks) – Open – Loose Gravel
  • Indian Gulch – Closed No Bridge TBD
  • Mormon Bar Crossing – Open
    • Repairs to begin 12-28-18 with Road closure with Detours
  • Old Toll Road/Bear Creek – Open – Loose Gravel
    • Repairs to begin on the 12-21-18 with traffic delays (Approximately 15 minutes)
  • Old Toll Road/Cow and Calf Gulch – Open – Loose Gravel
    • Repairs to begin on the 12-21-18 with traffic delays (Approximately 15 minutes)
  • School House Road Open – Repairs to begin 12-19-18 with traffic delays (Approximately 15 minutes) to be completed 12-20-18 with Permanent repairs
  • Usona Road – Open
    • Repairs to be completed by 12-28-18 there are traffic delays (Approximately 15 minutes)
  • W. Whitlock Road Open
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes
  • Yaqui Gulch Open – Permanent repairs complete

North County Roads Affected by Floods of 2018

  • Cadena Way – Open – loose gravel
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes)
  • Granite Springs Road – Open
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes)
  • Gusano Way – Open
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes)
  • Carrillo Way – Open
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes)
  • Hernandez Drive – Open
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes)
  • Jardincito Court – Open one lane
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes)
  • Laredo Drive Site #1 – Closed
    • Repairs to begin after the 1st of the year with Road closure with Detours
  • Laredo Drive Site #2 – Closed
    • Repairs to begin after the 1st of the year with Road closure with Detours
  • Panchito Way – Open
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minutes)
  • Rastro Way – Open
    • Repairs to begin after the 1st of the year with traffic delays (Approximately 15 minute